Build with items and assemblies
Use your library to price familiar work without starting from a blank row.
Add individual items or assemblies from the library. An item describes a single part of the work; an assembly combines materials and labour for a repeatable task. Review the components, quantities and your selling rates before adding them to the quote.

Choose an item for a single part of the work
Use an item when you want to price one material, labour entry or other part of the job. Browse the available library entries, check the description and unit, and choose the entry that fits your scope.
Review the quantity and selling rate before adding it to the quote. A library entry is a useful starting point; its wording and price still need to match the actual work and your company’s rates.
Use an assembly for a repeatable task
An assembly brings related components together. For a flooring task, for example, you might include the floor finish, adhesive and installation labour rather than adding each separately every time.
Check what the assembly includes and excludes. Review each component’s unit and factor, and confirm that the assembly’s base quantity matches the work you measured. Do not add the same materials again as separate quote items unless they represent additional scope.
Check factors, waste and selling rates
Component factors describe how much of a material or labour component is needed for the assembly quantity. Review them against the product specification and installation method for the job.
Add an appropriate waste allowance where needed and check that it has not already been included elsewhere. Use your own selling rates and inspect the resulting total before adding the assembly to the quote.
Keep your company’s knowledge reusable
Create company items and assemblies for work you estimate regularly. Use clear names and categories so your team can find the right entry on the next project.
Quote copies stay independent of later library changes. Review an existing quote directly when you need to change its scope or price; updating the library is preparation for future work, not a substitute for checking a quote already created.
Combine the library with measurements
Use the floorplan measurements to establish the required quantities, then select items or assemblies to describe and price the work. Review the units, component quantities and totals together before sharing the estimate.